Considerations
- Time Frame: The construction of a metal building is generally quicker than traditional buildings due to the prefabrication process. The timeline can vary, but most projects can be completed in a few months. Our company has a turnaround steel delivery average of 8-14 weeks.
- Costs: Costs can fluctuate based on size, complexity, location, and materials used. Metal buildings are often more affordable than conventional buildings.
- Weather: Metal buildings are highly weather-resistant, but care should be taken during construction to prevent weather-related delays.
1. Planning & Design
- Site Selection: Choose a suitable location for the building. Factors like accessibility, land slope, zoning regulations, and utilities are considered.
- Permitting & Zoning: Check local building codes and obtain any necessary permits. This may include approvals for zoning, safety regulations, and environmental considerations.
- Design & Customization: Work with an architect or building supplier to design the building. This includes decisions on dimensions (length, width, height), purpose (storage, office, etc.), door/window placement, insulation, and any other features or finishes.
- Structural Engineering: In some cases, the building design will need to be reviewed by a structural engineer to ensure it meets safety standards, particularly for load-bearing capacity, wind resistance, and seismic conditions.
2. Preparation of the Site
- Clearing the Land: The building site needs to be cleared of any trees, rocks, debris, or other obstacles.
- Grading and Leveling: The ground needs to be leveled to provide a stable foundation. If necessary, soil testing may be performed.
- Excavation: Digging for footings, foundations, and utility lines may be required, depending on the design.
- Foundation Construction: Most metal buildings use concrete foundations (e.g., slab-on-grade or pier foundations). This is where the steel frame will be anchored.
3. Fabrication of the Metal Building
- Ordering Materials: Once the design is finalized, materials such as steel beams, panels, bolts, doors, and windows are fabricated or pre-ordered from a manufacturer.
- Pre-Engineering: Metal building systems are often pre-engineered by manufacturers. This means the building components (steel frame, roof panels, wall panels, etc.) are pre-cut, pre-drilled, and pre-sized for efficient assembly.
4. Building the Frame
- Assembly of the Steel Frame: The steel frame is typically the first part of the building to be assembled. Steel columns and beams are bolted together to form the skeleton of the structure. This may involve cranes or heavy machinery, especially for large buildings.
- Installation of Roof Support Trusses: Roof trusses are installed to support the roof panels, ensuring the structure is stable.
5. Roof & Wall Installation
- Roof Panels: Once the frame is in place, metal roof panels are installed. These panels are often overlapping sheets of steel or other metals that are fastened onto the frame.
- Wall Panels: Wall panels are then attached to the frame, either as individual sheets or larger sections. Insulation may be added between the wall panels and the frame for temperature control and energy efficiency.
- Windows and Doors: Pre-made windows and doors are installed into the frame during this phase. Roll-up doors or overhead doors are often included, particularly in commercial and industrial buildings.
6. Utilities Installation
- Electrical Systems: Electrical wiring, outlets, lighting, and circuit panels are installed.
- Plumbing and HVAC: If the building will be used for residential or commercial purposes, plumbing and HVAC systems (heating, ventilation, and air conditioning) are integrated into the structure.
- Insulation: Additional insulation may be added to the walls, roof, or floors to ensure energy efficiency and comfort.
7. Interior Finishing
- Interior Walls and Partitions: If the building requires specific rooms or sections (such as offices or bathrooms), interior walls or partitions are constructed.
- Flooring: Depending on the intended use of the building, the flooring could be concrete, wood, or a specialized industrial flooring system.
- Finishing Touches: Any remaining details such as paint, trim, or exterior finishes are completed.
8. Final Inspection & Approvals
- Code Compliance: Once the building is completed, a final inspection is performed to ensure everything complies with local building codes and safety regulations.
- Certification: A certificate of occupancy may be issued, allowing the building to be used for its intended purpose.
9. Landscaping & Site Cleanup
- Landscaping: Depending on the site, landscaping may be done around the building for aesthetic purposes or to ensure proper drainage.
- Site Cleanup: Any construction debris or materials are cleaned up, and the site is prepared for use.
10. Move-In or Operational Start
- Once the building passes final inspections and is ready for use, the space can be occupied or put into operation.
Your Go-To General Contractor in Metro Atlanta*
Whether you are looking for a roof replacement or need helical piles to provide a solid foundation for your retaining wall, we have you covered. With over 200+ combined years in the industry, the team at Baldpates General Contracting delivers your project on time, within budget and with the best quality.
Our experts provide homes and businesses with lasting construction, renovation and restoration solutions. Our services include retaining walls, whether new walls or replacements, roofing, as in new commercial roofing and flat roofing, and ground up buildout metal buildings. We’re fully insured and licensed in the seven states of Louisiana, Mississippi, Alabama, Georgia, South Carolina, North Carolina and Tennessee.
Need a metal building for agricultural use? Looking for a retaining wall for that aesthetic appeal that feels so far out of reach? Call us for a FREE estimate and we will be delighted to assist you!